Utica MGB100 Instrucciones de operaciones

Busca en linea o descarga Instrucciones de operaciones para Chimeneas Utica MGB100. Utica MGB100 Operating instructions Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 28
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
INSTINST
INSTINST
INST
ALLAALLA
ALLAALLA
ALLA
TION MANUTION MANU
TION MANUTION MANU
TION MANU
AL AL
AL AL
AL
AND OPERAAND OPERA
AND OPERAAND OPERA
AND OPERA
TING INSTRTING INSTR
TING INSTRTING INSTR
TING INSTR
UCTIONSUCTIONS
UCTIONSUCTIONS
UCTIONS
MGBMGB
MGBMGB
MGB
GAS FIRED BOILERS
FOR FORCED HOT WATER
Utica Boilers, P.O. Box 4729 Utica, NY 13504
Vista de pagina 0
1 2 3 4 5 6 ... 27 28

Indice de contenidos

Pagina 1 - FOR FORCED HOT WATER

INSTINSTINSTINSTINSTALLAALLAALLAALLAALLATION MANUTION MANUTION MANUTION MANUTION MANUAL AL AL AL AL AND OPERAAND OPERAAND OPERAAND OPERAAND OPERATING

Pagina 2 - Pressure

PAGE 9VENT INSTVENT INSTVENT INSTVENT INSTVENT INSTALLAALLAALLAALLAALLATIONTIONTIONTIONTIONWARNING:WARNING:WARNING:WARNING:WARNING: This boiler shall

Pagina 3

VENT SYVENT SYVENT SYVENT SYVENT SYSTEM MODIFICASTEM MODIFICASTEM MODIFICASTEM MODIFICASTEM MODIFICATIONTIONTIONTIONTIONWhen an existing boiler is rem

Pagina 4

VENT DVENT DVENT DVENT DVENT DAMPER INSTAMPER INSTAMPER INSTAMPER INSTAMPER INSTALLAALLAALLAALLAALLATION TION TION TION TION AND INSTRAND INSTRAND INS

Pagina 5

CONNECTING GAS SERVICECONNECTING GAS SERVICECONNECTING GAS SERVICECONNECTING GAS SERVICECONNECTING GAS SERVICE1. Connect gas service from meter to con

Pagina 6 - FIGURE 1

LIGHTING INSTRUCTIONSLIGHTING INSTRUCTIONSLIGHTING INSTRUCTIONSLIGHTING INSTRUCTIONSLIGHTING INSTRUCTIONSWARNING:WARNING:WARNING:WARNING:WARNING: IF Y

Pagina 7 - FIGURE 3 FIGURE 4

FIGURE 14PAGE 14LIGHTING PROCEDURE FOR BOILER WITHLIGHTING PROCEDURE FOR BOILER WITHLIGHTING PROCEDURE FOR BOILER WITHLIGHTING PROCEDURE FOR BOILER WI

Pagina 8 - FIGURE 5

LIGHTING PROCEDURE FOR BOILERLIGHTING PROCEDURE FOR BOILERLIGHTING PROCEDURE FOR BOILERLIGHTING PROCEDURE FOR BOILERLIGHTING PROCEDURE FOR BOILERWITH

Pagina 9 - FIGURE 8

9. Push in gas control knob or reset button if so equipped, all the way in and hold.Immediately light the pilot with a match. Continue to hold the gas

Pagina 10 - FIGURE 10

GENERAL INSTRUCTIONSGENERAL INSTRUCTIONSGENERAL INSTRUCTIONSGENERAL INSTRUCTIONSGENERAL INSTRUCTIONSBefore seasonal start-up, have a competent service

Pagina 11

FIGURE 19FIGURE 20PAGE 18the mirror positioned above the burners, the flue gas passageways can be checked for sootor scale.The following procedure sho

Pagina 12 - FIGURE 12

TTTTTABLE OF CONTENTSABLE OF CONTENTSABLE OF CONTENTSABLE OF CONTENTSABLE OF CONTENTSSafety Symbols & Warnings ...

Pagina 13 - CONNECTING GAS SERVICE

The burners and pilot should be checked for signs of corrosion, rust or scale buildup.The area around the boiler must be kept clear and free of combus

Pagina 14

PAGE 20CHECK SAFETY CONTROL CIRCUIT, after burner adjustments are made, for satisfactoryoperation.1. Pilot: With main burner operating, turn the pilo

Pagina 15 - FIGURE 14

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTS - PILTS - PILTS -

Pagina 16 - FIGURE 16

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTS - BTS - BTS - BTS

Pagina 17

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTS - JTS - JTS - JTS

Pagina 18 - FIGURE 17 FIGURE 18

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTSTSTSTSTSHEAHEAHEAH

Pagina 19 - FIGURE 20

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTSTSTSTSTSPIPING &am

Pagina 20 - FIGURE 21

§ § § **†∆∆∆∆∆ Natural PropaneBoiler A.G.A. Heating I=B=R NetRating No. Recommended Gas Orifice WaterNo. Input Capacity NetOutput Sq. Ft. HW of Air Cu

Pagina 21 - FIGURE 23

*Pump sizeBoiler Natural Dimensions Supply &No. Gas ReturnInlet A B C D E F TappingsMGB 50 1/2" 11.1/8" 5.1/2" 4" 30.3/4"

Pagina 22 - FIGURE 24

IMPORIMPORIMPORIMPORIMPORTTTTTANT!ANT!ANT!ANT!ANT! READ ALL INSTRUCTIONS BEFORE INSTALLING.WARNING:WARNING:WARNING:WARNING:WARNING:1. Keep boiler area

Pagina 23 - FIGURE 26

INSTINSTINSTINSTINSTALLAALLAALLAALLAALLATION PRTION PRTION PRTION PRTION PROCEDUREOCEDUREOCEDUREOCEDUREOCEDUREWARNING: Improper installation, adjustme

Pagina 24 - FIGURE 27

PAGE 4COMBCOMBCOMBCOMBCOMBUSTION USTION USTION USTION USTION AIR REQAIR REQAIR REQAIR REQAIR REQUIREMENTSUIREMENTSUIREMENTSUIREMENTSUIREMENTS(MINIMUM

Pagina 25 - FIGURE 28

PAGE 5construction, air for combustion and ventilation must be obtained from outdoors or fromspaces freely communicating with the outdoors. A permanen

Pagina 26 - FIGURE 29

FIGURE 3 FIGURE 4shall be permitted where the equipment has clearances of at least 1 inch from the sides, 1inch from the back, and 6 inches from the f

Pagina 27

PAGE 7FIGURE 7FIGURE 6BYPASS PIPINGMIXING VALVE PIPING3. Hot water boilers installed above radiation level must be provided with a low water cut-off d

Pagina 28 - PAGE 27 REV 14.1, May 2004

PAGE 87. Installation using circulators is shown in figure 9 below.8. Installation using zone valves is shown in figure 10 on page 9.9. For further pi

Comentarios a estos manuales

Sin comentarios